2. Product show and rack installation, fix the machine
Install the foot according to the drawing or video, install the foot cup and wheel, and fix the printer.
As shown:
01 Trolley ink stack assembly |
02 Control panel |
03 Right machine foot |
04 Left machine foot |
05 Machine foot bottom beam |
06 Machine foot bottom plate |
07 Ink tank holder |
08 Ink tank |
09 Ink cartridge holder |
10 Ink cartridge |
11 Put the material holder right |
12 Put the material holder left |
13 Put the material pipe |
14 Waste ink tank holder |
15 Feeder |
Refer to the following video 1 :
Refer to the following video 2 :
Add: No.6-2, Jinhua Zhong Road,Zhongshan
Tel: 86-760-88667090
Fax: 86-760-88667096
E-mail: betty@titanjet.com.cn
vivian@titanjet.com.cn
market2@titanjet.com.cn
market3@titanjet.com.cn